The Global Kashmir
No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper
en English
ar Arabiczh-CN Chinese (Simplified)en Englishru Russianes Spanishur Urdu
No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper
No Result
View All Result
The Global Kashmir
No Result
View All Result
IMG 20260417

Div Com Kashmir reviews progress of 60 MLD Noorbagh STP, other Key Projects

News Desk by News Desk
April 18, 2026
Reading Time: 2 mins read
0
19
VIEWS
Share on Facebook

SRINAGAR : Divisional Commissioner Kashmir, Anshul Garg, on friday conducted a comprehensive review of the progress on the 60 MLD Sewage Treatment Plant (STP) at Noorbagh, along with other major ongoing projects being executed by the Urban Environmental Engineering Department (UEED) in Kashmir.
The meeting was attended by Deputy Commissioner Srinagar, Akshay Labroo; Chief Engineer, KPDCL; Superintending Engineer, UEED; Executive Engineer, R&B; representatives from NBCC; and other concerned officials.
At the outset, the Superintending Engineer, UEED, delivered a detailed presentation covering key aspects of the projects, including electricity supply, leakage issues, pending household connections, relocation of shops along the 90-feet road, and demolition of unsafe structures at Alamgiribazar.
He also shared details on the preparation of a Detailed Project Report (DPR) for newly developed habitations in Zone-III of Greater Srinagar, incorporating advanced systems such as tertiary treatment and SCADA for the 60 MLD STP.
The meeting also reviewed progress on other proposed STPs, including a 30 MLD facility aimed at mitigating pollution in Dal Lake, a 14 MLD STP at Alluchibagh, and a 6 MLD STP to address pollution in Doodganga.
During the review, the Divisional Commissioner directed that all issues related to electricity supply and leakages at the Noorbagh STP be resolved by May 31 to ensure the facility becomes fully operational. He further emphasized expediting the connection of all pending households to the STP network.
Regarding the relocation of shops, officials informed that funds have already been released by UEED and the process is expected to be completed by August this year.
It was also noted that UEED is in the process of preparing a fresh in-house DPR for newly developed habitations in Zone-III of Greater Srinagar, incorporating tertiary treatment, SCADA, and Online Continuous Effluent Monitoring Systems (OCEMS).
With respect to the proposed 30 MLD STP, the chair was informed that all pending issues have been resolved, and both survey and design work have been completed, while site development is currently under progress.

READ ALSO

Director Information reviews functioning of DICs across Kashmir division

4 JKAP IR Battalion Celebrates Rashtriya Ekta Diwas at Wayun, Kupwara

ADC Handwara Chairs Meeting to Finalise Arrangements for National Unity Day Celebrations

ADVERTISEMENT
ShareTweetSendSharePinShare
ADVERTISEMENT
Previous Post

Lieutenant Governor visited Sariah in Rajouri, inaugurated several development projects

Next Post

CM Omar Abdullah meets delegations, assures time-bound redressal of public issues

RelatedPosts

Director Information reviews functioning of DICs across Kashmir division

Director Information reviews functioning of DICs across Kashmir division

October 30, 2026
4 JKAP IR Battalion Celebrates Rashtriya Ekta Diwas at Wayun, Kupwara

4 JKAP IR Battalion Celebrates Rashtriya Ekta Diwas at Wayun, Kupwara

October 30, 2026
ADC Handwara Chairs Meeting to Finalise Arrangements for National Unity Day Celebrations

ADC Handwara Chairs Meeting to Finalise Arrangements for National Unity Day Celebrations

October 30, 2026

J&K Police Bust Jail-Linked Terror Fund-Raising Module In Shopian, 10 Arrested

Security Is Paramount, So Is Well-Being Of People: Sakina Itoo On Traffic Halts On Srinagar-Jammu Highway

Lieutenant Governor reviews preparations for observance of Rashtriya Ekta Diwas across Jammu Kashmir

Women’s Grievance Redressal Camp Held at Shumrial, Several Complaints Resolved on Spot

Kupwara Police Organise Women’s Awareness and Grievance Redressal Camp at Marhama

Lieutenant Governor Felicitates Winners of “Pedal Through Paradise”; Calls Youth the Greatest Strength of the Nation

Next Post
CM Omar Abdullah meets delegations, assures time-bound redressal of public issues

CM Omar Abdullah meets delegations, assures time-bound redressal of public issues

Satish Sharma emphasizes robust enforcement mechanism in Legal Metrology, zero tolerance for consumer exploitation

Satish Sharma emphasizes robust enforcement mechanism in Legal Metrology, zero tolerance for consumer exploitation

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ADVERTISEMENT

Company Info

Address: F11 silk factory road Tulsibagh, Srinagar
Phone : 9797970347.
Email : globalkashmir786@gmail.com
Owner, printer, publisher Editor : Suhail Yousuf Shah
Legal advisor : Advocate Umar Mushtaq
Printed at : K.T Press private Limited industrial Estate Rangreth J&K
Published from : F11 silk factory road Tulsibagh, Srinagar.
RNI No : JKENG/2011/38364
Office No's :
Postal Regd No : JKNP 160 / SKGPO 2012 - 2014

About

The Global Kashmir was founded in Srinagar, with a vision to promote positive news from the Kashmir valley and across the globe. Covering first hand, all categories of news from different corners of Jammu and Kashmir as well as relevant national and international news stories. Global Kashmir is dedicated to providing unbiased stories that are yet to be told...

News By Topic

Company Info

  • Contact Us
  • About

© 2022 - Global Kashmir

No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper

© 2022 - Global Kashmir