The Global Kashmir
No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper
en English
ar Arabiczh-CN Chinese (Simplified)en Englishru Russianes Spanishur Urdu
No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper
No Result
View All Result
The Global Kashmir
No Result
View All Result
IMG 20260925 WA0086

Govt to expedite Devar Lolab NTPHC works; Rs 40 Lakh earmarked: Sakeena Itoo

News Desk by News Desk
September 26, 2026
Reading Time: 1 min read
0
10
VIEWS
Share on Facebook

SRINAGAR : Minister for Health and Medical Education, Sakeena Itoo, on friday informed the Legislative Assembly that the PHC building at Devar Lolab, Kupwara was approved under the district sector in 2020-21 through J&K Housing Board as executing agency. She said the project was approved at Rs 199 lakh and allotted at Rs 141 lakh with a completion period of three financial years.
The Minister was replying to a Calling Attention Motion moved by MLA Qaysar Jamshaid Lone regarding prolonged delay in completion of PHC building at Diver Lolab.
The Minister stated that, owing to the considerable time elapsed since preparation of the original Detailed Project Report (DPR) and the subsequent revision in construction costs, the J&K Housing Board has submitted a revised DPR amounting ₹206.64 lakh for taking up the balance works of the NT-PHC Devar Lolab above the ground floor.
Sakeena Itoo said that the revised DPR is presently under scrutiny by the Chief Medical Officer (CMO), Kupwara to ensure that all essential components are incorporated and the building becomes fully functional upon completion.
The government has also stated that the department has already earmarked ₹40 lakh under the UT Capex Budget 2026-27 for the project and the funds will be utilised for execution of the balance works after finalization and approval of the revised DPR.
The Minister emphasized that the department is committed to complete the balance work in a time-bound manner.

READ ALSO

Thousands join ‘Run for Unity’ in Kupwara to celebrate National Unity Day

EOW Kashmir files chargesheet against two for duping job seekers of Rs 15 lakh

Abrogation of Article 370 integrated Kashmir with India: Amit Shah

ADVERTISEMENT
ShareTweetSendSharePinShare
ADVERTISEMENT
Previous Post

Patnitop proposed under Centre’s Globally Competitive Tourism Destination Scheme: CM

Next Post

Govt intensifies relief, restoration measures in Rajouri, Poonch; seeks IMCT assessment: Dy CM

RelatedPosts

Thousands join ‘Run for Unity’ in Kupwara to celebrate National Unity Day

Thousands join ‘Run for Unity’ in Kupwara to celebrate National Unity Day

October 31, 2026
CBK Raids Multiple Locations In Central Kashmir

EOW Kashmir files chargesheet against two for duping job seekers of Rs 15 lakh

October 31, 2026
Modi Govt’s zero tolerance policy against terrorism is clear: Shah

Abrogation of Article 370 integrated Kashmir with India: Amit Shah

October 31, 2026

Dr GoodDay LuxCare Studio Opens Sixth Outlet in Kashmir

Shopian freezes at 0.5°C as night temperatures dip across Kashmir

Director Information reviews functioning of DICs across Kashmir division

4 JKAP IR Battalion Celebrates Rashtriya Ekta Diwas at Wayun, Kupwara

ADC Handwara Chairs Meeting to Finalise Arrangements for National Unity Day Celebrations

J&K Police Bust Jail-Linked Terror Fund-Raising Module In Shopian, 10 Arrested

Next Post
Govt intensifies relief, restoration measures in Rajouri, Poonch; seeks IMCT assessment: Dy CM

Govt intensifies relief, restoration measures in Rajouri, Poonch; seeks IMCT assessment: Dy CM

Div Com directs for resolution of issues for timely rollout of healthcare services at AIIMS Awantipora

Div Com directs for resolution of issues for timely rollout of healthcare services at AIIMS Awantipora

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ADVERTISEMENT

Company Info

Address: F11 silk factory road Tulsibagh, Srinagar
Phone : 9797970347.
Email : globalkashmir786@gmail.com
Owner, printer, publisher Editor : Suhail Yousuf Shah
Legal advisor : Advocate Umar Mushtaq
Printed at : K.T Press private Limited industrial Estate Rangreth J&K
Published from : F11 silk factory road Tulsibagh, Srinagar.
RNI No : JKENG/2011/38364
Office No's :
Postal Regd No : JKNP 160 / SKGPO 2012 - 2014

About

The Global Kashmir was founded in Srinagar, with a vision to promote positive news from the Kashmir valley and across the globe. Covering first hand, all categories of news from different corners of Jammu and Kashmir as well as relevant national and international news stories. Global Kashmir is dedicated to providing unbiased stories that are yet to be told...

News By Topic

Company Info

  • Contact Us
  • About

© 2022 - Global Kashmir

No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper

© 2022 - Global Kashmir