The Global Kashmir
No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper
en English
ar Arabiczh-CN Chinese (Simplified)en Englishru Russianes Spanishur Urdu
No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper
No Result
View All Result
The Global Kashmir
No Result
View All Result
IMG 20230410 WA0014

Nitin Gadkari, LG Manoj Sinha Alongside MPs Inspect Zojila Tunnel

Hailed as Asia's longest, Zojila Tunnel to Establish All-weather Connectivity for Ladakh; Completion of Tunnel to Bring Current 3 Hour Travel Time Down to 20 Minutes

News Desk by News Desk
April 10, 2023
Reading Time: 2 mins read
0
19
VIEWS
Share on Facebook

Srinagar : Union Minister for Road Transport and Highways Nitin Gadkari on Monday inspected Zojila Tunnel – Asia’s longest tunnel to establish all weather connectivity for Ladakh – alongside Lieutenant Governor of Jammu and Kashmir Manoj Sinha and members of Parliament of Parliamentary Consultative Committee on Road Transport and Highways.

READ ALSO

Army Pays Tribute To Soldiers Who Died In Galwan Valley Clash With China

Ladakh delegations meet Sitharaman, demand special relief for tourism sector

President of India promulgates reservation, domicile regulations for Ladakh

The construction of 13.14 km long Zojila tunnel and approach road is coming up at a cost of Rs 6800 crore. It is a 7.57 m high horseshoe-shaped single-tube, 2-lane tunnel, which will pass under the Zojila Pass in the Himalayas between Ganderbal in Kashmir and Drass town in Kargil district of Ladakh.

The project, includes a Smart Tunnel (SCADA) system, which has been constructed using the New Austrian Tunneling Method. It is equipped with facilities like CCTV, radio control, uninterrupted power supply and ventilation. The use of modern technology in this project has saved the Government of India more than 5000 crore rupees.

Under the Zojila Tunnel project,the main Zojila tunnel of 13,153 meters with 4 culverts of total length of 810 meters, 4 Nilgrar tunnels of total length of 4,821 meters, 8 cut and covers of total length of 2,350 meters and three 500 meters, 391 meters and 220 meters of vertical ventilation shaft are proposed. So far 28% work of Zojila Tunnel has been completed.

With the construction of this tunnel, there will be all-weather connectivity for Ladakh. Currently the average travel time to cross the Zojila Pass sometimes takes three hours, after the completion of this tunnel the travel time will come down to 20 minutes. The reduction in travel time will ultimately result in fuel savings.

The terrain near Zojila Pass is extremely inhospitable, with many fatal accidents taking place here every year. After the completion of Zojila Tunnel, the chances of accidents will be zero. This tunnel will provide year-round connectivity between the Kashmir Valley and Ladakh, which will be extremely important for the development of Ladakh, promotion of tourism, free movement of local goods and movement of Indian armed forces in case of emergency.

Notably, 19 tunnels are being constructed in Jammu and Kashmir at a cost of Rs 25000 crore. (GNS)

ADVERTISEMENT
ShareTweetSendSharePinShare
ADVERTISEMENT
Previous Post

Class 8 results to be declared today

Next Post

2 girls jump off a moving car to escape alleged molestation bid in Handwara

RelatedPosts

Army Pays Tribute To Soldiers Who Died In Galwan Valley Clash With China

Army Pays Tribute To Soldiers Who Died In Galwan Valley Clash With China

June 16, 2025
Ladakh delegations meet Sitharaman, demand special relief for tourism sector

Ladakh delegations meet Sitharaman, demand special relief for tourism sector

June 16, 2025
President of India promulgates reservation, domicile regulations for Ladakh

President of India promulgates reservation, domicile regulations for Ladakh

June 3, 2025

Let World Know That India Supports Peace, But Will Respond To Terror Attacks: Rijiju On All-Party Delegations’ Mission

Himalayan Ibex shot by poachers rescued, four arrested in Ladakh

BRO Battles To Restore Strategic Srinagar-Leh Connectivity Via Zojila Pass

Our govt gives top priority to sports development in J&K, Ladakh: PM Modi

Will Make All Efforts To Send Men’s Ice-Hockey Team To China For Asian Winter Games: Ladakh LG

Centre’s Wildlife Panel Clears Proposals To Build Strategic Infra In Eastern Ladakh

Next Post
2 girls jump off a moving car to escape alleged molestation bid in Handwara

2 girls jump off a moving car to escape alleged molestation bid in Handwara

DDC Kupwara chairs Gram Sabha at Manigah Hyhama for GPDP preparation

DDC Kupwara chairs Gram Sabha at Manigah Hyhama for GPDP preparation

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ADVERTISEMENT

Company Info

Address: F11 silk factory road Tulsibagh, Srinagar
Phone : 9797970347.
Email : globalkashmir786@gmail.com
Owner, printer, publisher Editor : Suhail Yousuf Shah
Legal advisor : Advocate Umar Mushtaq
Printed at : LUBAAB PUBLICATIONS LAWAYPORA SRINAGAR
Published from : Green house Soitang, Srinagar, Kashmir.
RNI No : JKENG/2011/38364
Office No's :
Postal Regd No : JKNP 160 / SKGPO 2012 - 2014

About

The Global Kashmir was founded in Srinagar, with a vision to promote positive news from the Kashmir valley and across the globe. Covering first hand, all categories of news from different corners of Jammu and Kashmir as well as relevant national and international news stories. Global Kashmir is dedicated to providing unbiased stories that are yet to be told...

News By Topic

Company Info

  • Contact Us
  • About

© 2022 - Global Kashmir

No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper

© 2022 - Global Kashmir