The Global Kashmir
No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper
en English
ar Arabiczh-CN Chinese (Simplified)en Englishru Russianes Spanishur Urdu
No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper
No Result
View All Result
The Global Kashmir
No Result
View All Result
Ashwini Vaishnaw 17 1536x1052 1

Centre Planning Underground Rail Tracks Along 40-Km Corridor Connecting NE, Rest Of India: Vaishnaw

News Desk by News Desk
February 3, 2026
Reading Time: 2 mins read
0
20
VIEWS
Share on Facebook

Guwahati : Union minister Ashwini Vaishnaw on Monday said plans are afoot to lay underground railway tracks along a 40-km strategic corridor in West Bengal, connecting the northeast with the rest of India.
The strategic corridor, called the ‘Chicken’s Neck’ for its shape, is a strip of land located in northern West Bengal’s Siliguri area, having a width of over 20 km. The strip is sandwiched between Nepal and Bangladesh, with Bhutan and China a few hundred kilometres away.

READ ALSO

Population Census From Jan 25-Feb 28, 2027; Reference Date Mar 1

BJP Will Bring UCC In Uttar Pradesh If Voted To Power Again: Amit Shah

SC Dismisses NIA’s Plea Challenging Bail Granted To J&K Activist Khuram Parvez In UAPA Case

Addressing reporters through video conference on the Union Budget allocation for the railway ministry, Vaishnaw said, “There is special planning for the 40-km strategic corridor connecting the northeast with the rest of the country.”
“Planning is underway to lay underground railway tracks, and also make the existing tracks four-line,” he said.
Sharing details, Northeast Frontier Railway (NFR) General Manager Chetan Kumar Shrivastava and Chief Administrative Officer (Construction), Hitendra Goyal, said the underground lines will be between Tin Mile Haat and Rangapani railway stations in West Bengal.

“This underground stretch is important from a security point of view,” Shrivastava said.

One of the lines will go towards Bagdogra in West Bengal, which is vital for the air defence mechanism of the country.
Shrivastava said the tracks will be laid around 20-24 metres underground over a plain area.

Goyal added that along with the underground tracks, the existing double line on the stretch will be converted into a four-line one.
“When these plans are implemented, it will essentially mean that the strategic corridor will have six lines of railway track – four overground and two underground,” one of the officials said.
Assam had last year called for prioritising exploring alternative road routes effectively bypassing the ‘Chicken’s Neck’, after the head of Bangladesh’s interim government Muhammad Yunus made a controversial statement in China, saying India’s northeastern states are ‘landlocked’ and have no way to reach the ocean except through his country. (Agencies)

ADVERTISEMENT
ShareTweetSendSharePinShare
ADVERTISEMENT
Previous Post

Water Security In Region Depends On Responsible & Trans-Boundary Cooperation: Pak PM

Next Post

EAM Jaishankar to attend Critical Minerals Ministerial in US from February 2-4

RelatedPosts

Population Census From Jan 25-Feb 28, 2027; Reference Date Mar 1

Population Census From Jan 25-Feb 28, 2027; Reference Date Mar 1

October 31, 2026
Zero Tolerance Against Criminals Operating From Foreign Lands, Says Amit Shah

BJP Will Bring UCC In Uttar Pradesh If Voted To Power Again: Amit Shah

October 31, 2026
Red Fort Car Blast: Umer-un-Nabi Used Fake Identity To Procure Chemicals For Making Explosives, Says NIA

SC Dismisses NIA’s Plea Challenging Bail Granted To J&K Activist Khuram Parvez In UAPA Case

October 31, 2026

INDIA Bloc’s ‘Public Impeachment’ Of CEC Postponed To Saturday; Rahul Says Oppn Standing Together

Chopper On Way From Badrinath To Dehradun With 6 On Board Crashes

“Annadatas Are Strongest Pillars”: PM Modi Says Over Rs 18,000 Crore Transferred To Farmers Under PM-KISAN

India Ready To Share ‘Battle-Tested’ Anti-Terror Expertise With ASEAN, Its Dialogue Partners: Rajnath Singh

Dr Jitendra Visits ESTIC 2026 Exhibition, Reaffirms Government Facilitation To Link StartUps With Industry

Sitharaman Slams Rahul Gandhi Over Tata Comment, Says Cong Leader Spreading Distrust, Toxicity

Next Post
EAM Jaishankar to attend Critical Minerals Ministerial in US from February 2-4

EAM Jaishankar to attend Critical Minerals Ministerial in US from February 2-4

CDS Gen Anil Chauhan leads defence delegation to Armenia to boost defence ties

CDS Gen Anil Chauhan leads defence delegation to Armenia to boost defence ties

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ADVERTISEMENT

Company Info

Address: F11 silk factory road Tulsibagh, Srinagar
Phone : 9797970347.
Email : globalkashmir786@gmail.com
Owner, printer, publisher Editor : Suhail Yousuf Shah
Legal advisor : Advocate Umar Mushtaq
Printed at : K.T Press private Limited industrial Estate Rangreth J&K
Published from : F11 silk factory road Tulsibagh, Srinagar.
RNI No : JKENG/2011/38364
Office No's :
Postal Regd No : JKNP 160 / SKGPO 2012 - 2014

About

The Global Kashmir was founded in Srinagar, with a vision to promote positive news from the Kashmir valley and across the globe. Covering first hand, all categories of news from different corners of Jammu and Kashmir as well as relevant national and international news stories. Global Kashmir is dedicated to providing unbiased stories that are yet to be told...

News By Topic

Company Info

  • Contact Us
  • About

© 2022 - Global Kashmir

No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper

© 2022 - Global Kashmir