The Global Kashmir
No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper
en English
ar Arabiczh-CN Chinese (Simplified)en Englishru Russianes Spanishur Urdu
No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper
No Result
View All Result
The Global Kashmir
No Result
View All Result

Opinion | Chenab Railway Bridge: Taj Mahal of Engineering in the Himalayas

By : Adv. Tahir

News Desk by News Desk
June 11, 2025
Reading Time: 4 mins read
0
37
VIEWS
Share on Facebook

Suspended above the Chenab, India’s highest bridge isn’t just steel and stone—it’s a soaring promise of connection, courage, and Kashmir’s rising future.

READ ALSO

Opinion | J&K’s Reservation Conundrum: Between Social Justice and Falling Standards

Opinion | Civil-Military Relations in Jammu and Kashmir

Opinion | Women in the Army: Breaking Barriers in Kashmir

When world record meets human resolve, masterpieces emerge. The Chenab Railway Bridge—officially inaugurated on 6 June 2025—soars 359 metres above the Chenab River, claiming the title of the world’s highest singlearch railway bridge, even surpassing the Eiffel Tower by 35 metres Its debut heralds not just an engineering milestone, but a bold statement of India’s commitment to connecting its remote frontiers with the nation’s mainstream. The bridge forms a crucial segment of the grand Udhampur–Srinagar–Baramulla Rail Link (USBRL), a vision first mooted in 1983. Of the 338-kilometre corridor linking the Valley to India’s heartland, the Reasi–Banihal stretch presented engineering nightmares: deep gorges, unstable geology, and harsh weather. Yet engineers responded not with defeat, but innovation—designing a 1,315-metre deck arch that would drape elegantly across the Chenab’s roar.

Construction began in 2004, only to stall as questions arose about safety and feasibility. A high-level expert committee was formed, alignment was revised, and work resumed in 2009. Despite steep terrain, brutal winds, and seismic threats, teams toiled on, driven by a purpose more potent than any physical barrier. In April 2021, the iconic “golden joint” was installed—a defining moment when the arch’s two halves were finally united high above the river. By August 2022, construction was largely complete, and the bridge was ready for rigorous safety testing .

Defining Features of a Monument:

An imposing 467metre single arch woven from some 10,619 tonnes of prefabricated steel (livemint.com, en.wikipedia.org).

A grand total of 17 spans, with a sturdy 13.5 metre width supporting dual railway tracks (indiatoday.in).

Engineered to endure winds up to 266 km/h, earthquakes registering 8 on the Richter scale, and blasts approximating 40 tonnes of TNT (indiatoday.in).

ADVERTISEMENT

A life expectancy of 120 years, guaranteed by corrosionresistant coatings, real-time structural monitoring, and robust materials (indiatoday.in).

Construction involved an astonishing 28,660 tonnes of steel, 66,000 cubic metres of concrete, and 84 km of cable anchors and rock bolts—a testament to calculated ambition in hostile terrain (livemint.com). The steel largely came from SAIL’s Bhilai Plant, with over 12,000 tonnes supplied, underscoring domestic industrial capacities (timesofindia.indiatimes.com).

Design ingenuity wasn’t left to chance. International firms like WSP (Finland) and Leonhardt, Andrä und Partner (Germany) collaborated alongside Indian institutions—DRDO, IITs, and IISc—to ensure the bridge met global standards and tackled seismic and blast-resistant challenges (en.wikipedia.org).

In June 2024, the bridge hosted its first full train: a fully loaded eight-coach MEMU trundled across at 40 km/h during tests. The journey from Sangaldan to Reasi took just over an hour, traversing nine tunnels and spanning the bridge’s majestic arch. Railway Minister Ashwini Vaishnaw, overseeing the successful test, lauded its potential to operationalize rail service on this electrified route. Later trials saw faster speeds and enhanced regulatory oversight. Security protocols like blast-proofing and anti-corrosion layers were validated in real-world powwow .

On 6 June 2025, Prime Minister Narendra Modi flagged off the inaugural Vande Bharat Express traversing the Chenab Bridge—a debut that inspired national and international media alike. Coverage highlighted the 359metre gorge-crossing arch, calling it a “symbol of unity, resilience, and innovation”. Domestic pride found its voice in headlines: The Canadian-born Times of India marked it a “crowning achievement” built through “steely determination”, while the Economic Times prized the marvel’s all-weather readiness and strategic importance . Abroad, the bridge touted India’s civil-engineering leadership—Reuters, AP, and Indian Express called it a “world’s highest” marvel, emphasizing its geopolitical significance. For passengers and pilots alike, the bridge became more than infrastructure—it was spectacle. Pilots flying over the structure started making special announcements to passengers eager for aerial glimpses, turning the bridge into a nascent tourist site.

The Chenab Railway Bridge does more than carry tracks; it carries hope. For Kashmir’s farmers, traders, students, and tourists, it transforms access. Lecturers now commute between Banihal and Srinagar, and nursing students board trains instead of relying on uncertain roads. The bridge doesn’t just cross a river: it bridges lives and aspirations. Strategically, it strengthens logistics across difficult terrains, vital for both commerce and security in border regions . Economically, it promises a surge in tourism and the timely transport of apples, saffron, and Pashmina crafts—chips in Kashmir’s unique palette .

From earthquakes to legal petitions, the Chenab Bridge’s journey was fraught with scrutiny and delays. Nearly eight years were spent in PILs litigating concerns about alignment, environmental impact, and cost, interrupting progress for years.Logistical nightmares persisted—mountainous valleys, landslides, and unpredictable weather demanded innovation: custom road networks, cable cranes, and meticulous safety planning . Yet no challenge bent human determination. When the passport of adversity arrived, engineers answered with prize-winning design, regulatory finesse, and collaborative grit. With commercial operations underway, the USBRL corridor is set to transform lives. Travel time will shrink dramatically: estimates suggest journeys between Katra and Srinagar may drop to under three hours . Athletic tourists, pilgrims, and everyday commuters will find their journeys faster, safer, and more reliable.

The bridge also sets a precedent—offering a model of how to conquer similar challenges. Future infrastructure projects in the Himalayas, railways, and strategic corridors will lean on Chenab’s lessons in design, collaboration, and resilience. In the age-old Himalayan saga, where nature’s might challenges man’s will, the Chenab Railway Bridge stands as a testament to ambition born of precision, collaboration, and purpose. It is proof that the valley, once cut off by seasons and strife, now rides on rails of connection—engineered with care and vision. As the first trains rumble over the iron archil, billions of rivets hold more than steel—they bind Kashmir’s dreams to India’s promise. And for those who witness the sunrise over the Chenab from a passenger window, the gorge becomes not a divide, but a doorway to a shared future.

Writer can be reached at advocatetahir2024@gmail.com

ShareTweetSendSharePinShare
ADVERTISEMENT
Previous Post

Opinion | The Hidden Crisis of Kashmir’s Lidder River

Next Post

Editorial | Stay away, save life

RelatedPosts

Opinion | J&K’s Reservation Conundrum: Between Social Justice and Falling Standards

Opinion | J&K’s Reservation Conundrum: Between Social Justice and Falling Standards

June 15, 2025
Opinion | Civil-Military Relations in Jammu and Kashmir

Opinion | Civil-Military Relations in Jammu and Kashmir

June 15, 2025
Opinion | Women in the Army: Breaking Barriers in Kashmir

Opinion | Women in the Army: Breaking Barriers in Kashmir

June 15, 2025

Opinion | Father, the Silent Hero

Opinion | A Journey of Faith, Unity and Preparedness: Amarnath Yatra 2025 hashtag #ValleyWelcomesYatris

Opinion | Chenab Bridge, The Path That Speaks To Skies

Opinion | South Kashmir After 370: Progress Beyond Politics

Opinion | Sopore’s Apple Economy: Strengthening the Backbone of Kashmir’s Horticulture

Opinion | Target of Civilians through Cross LoC Firing by Pakistan

Next Post
Editorial | Stay away, save life

Editorial | Stay away, save life

”Good results, very high quality meetings”: Tharoor hails his delegation”s work after 5-nation tour

''Good results, very high quality meetings'': Tharoor hails his delegation''s work after 5-nation tour

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ADVERTISEMENT

Company Info

Address: F11 silk factory road Tulsibagh, Srinagar
Phone : 9797970347.
Email : globalkashmir786@gmail.com
Owner, printer, publisher Editor : Suhail Yousuf Shah
Legal advisor : Advocate Umar Mushtaq
Printed at : LUBAAB PUBLICATIONS LAWAYPORA SRINAGAR
Published from : Green house Soitang, Srinagar, Kashmir.
RNI No : JKENG/2011/38364
Office No's :
Postal Regd No : JKNP 160 / SKGPO 2012 - 2014

About

The Global Kashmir was founded in Srinagar, with a vision to promote positive news from the Kashmir valley and across the globe. Covering first hand, all categories of news from different corners of Jammu and Kashmir as well as relevant national and international news stories. Global Kashmir is dedicated to providing unbiased stories that are yet to be told...

News By Topic

Company Info

  • Contact Us
  • About

© 2022 - Global Kashmir

No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper

© 2022 - Global Kashmir