The Global Kashmir
No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper
en English
ar Arabiczh-CN Chinese (Simplified)en Englishru Russianes Spanishur Urdu
No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper
No Result
View All Result
The Global Kashmir
No Result
View All Result
IMG 20241207 WA0012

Sanat Nagar flyover likely to open by April-2025

News Desk by News Desk
December 7, 2024
Reading Time: 2 mins read
0
27
VIEWS
Share on Facebook

Srinagar : The much-awaited Sanat Nagar flyover along the Srinagar expressway bypass on NH44 is expected to open for traffic in April next year.

READ ALSO

DC Kulgam leads Block Diwas at Qaimoh Assures redressal of public grievances

DM Bandipora chairs NCORD meeting Reviews Anti-Drug measures, directs strict action against repeat offenders

DC Ganderbal flags off Exposure-cum-Sports Tour for Children with Special Needs

To ease congestion at the Bemina, Sanat Nagar and Nowgam intersections, the National Highway Authority of India (NHAI) proposed constructing three 3.23-kilometer flyovers along NH44 in 2020.
While the Bemina and Nowgam flyovers are already operational, the Sanat Nagar project faced delays, primarily due to a prolonged approval process by the Union Ministry of Road Transport and Highways, which took nearly two years.
“The construction of the other grade separators progressed quickly, but the work on the Sanat Nagar flyover was delayed due to approval issues,” an official from the Roads and Buildings Department said. He added that the delay was likely caused by the need to relocate significant utilities along the route.
Chief Engineer of the Roads and Buildings Department, Sajjad Naqeeb, confirmed that the Sanat Nagar flyover, which is coming up at the cost Rs 45 crore, is on track for completion by April 2025. “The work is moving swiftly, and the project will be open to the public by then,” he said.
The Sanat Nagar intersection has long been a source of frustration for commuters due to frequent and lengthy traffic bottlenecks.
“We appreciate the focus on addressing the issues at these crossings. Unlike other delayed projects, we hope the Sanat Nagar flyover will be completed on schedule,” Idrees Ahmad, a local commuter, said.
He added that the new flyover would reduce travel time and improve traffic flow at this junction.
With the completion of this project the major bottleneck on Srinagar expressway bypass will be removed. Another project costing Rs 133 cr has been sanctioned for Srinagar bypass which will further ease out the traffic snarls.
The project comprises a single package including one overhead bridge at the Children’s Hospital, a vehicular overpass at Muminabad Junction, and a 2-kilometer flyover on the Parimpora-Shalteng stretch. (Daily Excelsior)

ADVERTISEMENT
ShareTweetSendSharePinShare
ADVERTISEMENT
Previous Post

UNGA Unanimously Adopts Resolution Co-Sponsored By India Declaring December 21 As World Meditation Day

Next Post

Five residential houses, three vehicles attached under NDPS Act in Anantnag

RelatedPosts

DC Kulgam leads Block Diwas at Qaimoh Assures redressal of public grievances

DC Kulgam leads Block Diwas at Qaimoh Assures redressal of public grievances

October 28, 2026
DM Bandipora chairs NCORD meeting Reviews Anti-Drug measures, directs strict action against repeat offenders

DM Bandipora chairs NCORD meeting Reviews Anti-Drug measures, directs strict action against repeat offenders

October 28, 2026
DC Ganderbal flags off Exposure-cum-Sports Tour for Children with Special Needs

DC Ganderbal flags off Exposure-cum-Sports Tour for Children with Special Needs

October 28, 2026

DC Srinagar presides over PM Surya Ghar Awareness-cum-Registration camp at Ghanta Ghar Lal Chowk

DC Kupwara Inspects Transit Accommodation at Nutnussa, Directs Completion Within a Fortnight

DC Kupwara Flags Off Student Rally Under Tobacco-Free Youth Campaign 4.0

DM Kupwara Chairs NCORD Meeting, Calls for Zero Tolerance Against Drug Menace

Lieutenant Governor Lays Foundation Stone of Kashmir Chapter of Centre for Regional Studies, Culture, Dialects and Emotional Intelligence of University of Jammu

DC Anantnag Administers Integrity Pledge to Employees at Dak Bungalow

Next Post
Five residential houses, three vehicles attached under NDPS Act in Anantnag

Five residential houses, three vehicles attached under NDPS Act in Anantnag

ADC Kupwara reviews arrangements for conduct of constable exam

ADC Kupwara reviews arrangements for conduct of constable exam

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ADVERTISEMENT

Company Info

Address: F11 silk factory road Tulsibagh, Srinagar
Phone : 9797970347.
Email : globalkashmir786@gmail.com
Owner, printer, publisher Editor : Suhail Yousuf Shah
Legal advisor : Advocate Umar Mushtaq
Printed at : K.T Press private Limited industrial Estate Rangreth J&K
Published from : F11 silk factory road Tulsibagh, Srinagar.
RNI No : JKENG/2011/38364
Office No's :
Postal Regd No : JKNP 160 / SKGPO 2012 - 2014

About

The Global Kashmir was founded in Srinagar, with a vision to promote positive news from the Kashmir valley and across the globe. Covering first hand, all categories of news from different corners of Jammu and Kashmir as well as relevant national and international news stories. Global Kashmir is dedicated to providing unbiased stories that are yet to be told...

News By Topic

Company Info

  • Contact Us
  • About

© 2022 - Global Kashmir

No Result
View All Result
  • Home
  • News
    • Kashmir
    • Jammu
  • National
  • World
  • Business
  • Editorial
  • Health
  • Opinion
  • Sports
  • Tech
  • E-Paper

© 2022 - Global Kashmir